Skip to content

Jared and Tabitha's Bearhawk Construction Log

The story of N805TB

Menu
  • Bearhawk Flight Training
  • Recent Posts
  • Search
  • Welcome to Our Building Log!
  • Privacy Policy
Menu

Wing Repair Continued

Posted on September 3, 2012April 28, 2013 by Jared Yates

Picking up where I left off last time, I finished the wing repair

Ready to Rivet
Ready to Rivet

Ready to prep and paint
Ready to prep and paint

While I had the air drill over on that side of the hangar, I also removed the metal strip that I had installed in the wing tip to allow for flush mounting of the fiberglass tips. At this point it just makes more sense to use the much simpler overlap method instead.

Leave a Reply

You must be logged in to post a comment.

Navigation

  • The Most Recent Posts
  • Posts about Building
  • Posts About Flying
  • Commentary Posts
  • Bearhawk Flight Training
  • Buy Your Own Bearhawk Kit!
  • Our Bearhawkstore.com
  • Meet More Bearhawk Builders
  • Privacy Policy
© 2025 Jared and Tabitha's Bearhawk Construction Log | Powered by Superbs Personal Blog theme