Today I drilled and clecoed the rudder cable guards in place. The aft guards are too short. I tried to make them 24″ long each so that they would come out of a 48″ piece of stock. Since the aft bulkhead forms an obtuse angle with the floorboard, the cable guard needs to be longer on the top, and I didn’t account for that. The other complication is the back door on the right side. Since the door sill goes so low, I’ll have to figure out a way to make the transition.