Today I reinstalled the horizontal stabilizer. The strategy at this phase of construction is to add as many of the existing parts as possible onto the airplane to try and fix any interference issues that may have crept up. I spent some time planning for the routing of the propeller control and prop governor oil line, and I spent a little while welding some of the exhaust pipes.