Engine Preparations

Posted on May 28, 2013October 26, 2013 by Jared Yates

As I prepare to put the engine on for what will hopefully be the last time before we fly, I took advantage of the easy access of having it on the lift to finish up a few jobs.

Engine on the lift
Engine on the lift

One was to install the oil line that will run from the prop governor to the fitting on the front of the engine, just behind the prop.
Oil Line Routing
Oil Line Routing

I had planned to make this line at one point, but after spending some time with this one, I think buying it premade was a better idea. The line was available for around $120 plus shipping, but I was fortunate enough to find this one from another builder who was converting an engine back to fixed pitch. I offered him $100, and I think he thought I was crazy to want to pay that much for it. It was a little bit tricky to install, and I had to cut a hole in the front right baffle to make room for the line
Baffle hole
Baffle hole

I also filled the brakes with 5606 hydraulic fluid, and started making a coax-based glideslope antenna.

Leave a Reply

You must be logged in to post a comment.

Navigation

  • The Most Recent Posts
  • Posts about Building
  • Posts About Flying
  • Commentary Posts
  • Bearhawk Flight Training
  • Buy Your Own Bearhawk Kit!
  • Our Bearhawkstore.com
  • Meet More Bearhawk Builders
  • Privacy Policy
© 2025 Jared and Tabitha's Bearhawk Construction Log | Powered by Superbs Personal Blog theme