Skip to content

Jared and Tabitha's Bearhawk Construction Log

The story of N805TB

Menu
  • Bearhawk Flight Training
  • Recent Posts
  • Search
  • Welcome to Our Building Log!
  • Privacy Policy
Menu

Preliminary Control Rigging

Posted on April 16, 2012January 27, 2013 by Jared Yates

With the flap cables in place, I was able to work on adjusting the flap rigging. I adjusted the pushrods until the flaps came up to zero degrees under spring tension. I started to adjust the aileron cables and realized that my loop is just a little bit too short, and I’ll need to make a new version of one of the back cables that’s about 3/4″ longer than the current one.

Tabitha stopped by to say hi and Felicia says "Oh Dad, why aren't you done with this yet?"
Tabitha stopped by to say hi and Felicia says “Oh Dad, why aren’t you done with this yet?”

Leave a Reply

You must be logged in to post a comment.

Navigation

  • The Most Recent Posts
  • Posts about Building
  • Posts About Flying
  • Commentary Posts
  • Bearhawk Flight Training
  • Buy Your Own Bearhawk Kit!
  • Our Bearhawkstore.com
  • Meet More Bearhawk Builders
  • Privacy Policy
© 2025 Jared and Tabitha's Bearhawk Construction Log | Powered by Superbs Personal Blog theme